Car Parking Lifts On a regular basis

Maintenance of hydraulic lift maintenance time

1. Daily maintenance (per shift).

2. After 1,500 hours of work, minor repairs to mechanical and electrical systems are performed.

3. After 5,000 hours of work, the mechanical and electrical system shall be repaired.

4. After 10,000 hours of work, the mechanical and electrical systems are overhauled.

Maintenance and maintenance of hydraulic lift mechanical equipment:

1. The brakes of each agency should always check and adjust the clearance of brake and brake wheel and ensure the flexibility and reliability. On the surface of friction, there should be no dirt, and the dirt must be washed off with gasoline or thinner.

2. The lubrication and hydraulic oil of gearbox, gearbox and external meshing gear shall be carried out according to the requirements in the lubrication chart.

3. Be sure to check whether the wire ropes and loose strands are found in all the wire ropes. If more than the relevant regulations must be replaced immediately. The maintenance of steel wire rope should be strictly according to gb5144-85.

4. Check the connection of each department frequently, and tighten it if it is loose. The body connection bolts should check the tightness when the body is under pressure (the rotating arm can be used to cause the compression condition). All the connecting shafts must be open and open and fully open.

5. It is necessary to check whether the operation of various agencies is normal, and there is no noise. If there is any trouble, it must be eliminated in time.

6. When installing, disassembling and adjusting the rotating mechanism, it should be noted that the center line of the reducer of the rotary mechanism is parallel to the center line of the gear, and its meshing surface is not less than 70%, and the meshing space should be suitable.

Check all wires and cables for any damage. Timely bandage and replacement of damaged parts.

8. If the motor has overheating, it should stop in time. After troubleshooting, it will continue to operate. The motor bearing shall be well lubricated.

9. Each part of the brush, its contact surface should be kept clean, adjust the brush pressure, so that its contact area is not less than 50%.

10. The control boxes and distribution boxes of hydraulic lift are always kept clean and clean the dust on the electrical equipment in time.

Some safety requirements for lift installation

A. The installation site should be cleaned and enclosed with A marker rod to prevent non-staff from entering the site;

B. Prevent falling objects from above the installation site and safety net when necessary;

C. During the installation process, there must be a person responsible and unified command;

D. When the platform is running, the head and hand of the personnel cannot reveal the safety column;

E. If someone is working on the guide rail or attached to the wall, it is not allowed to start the lift. When the cage is hoisted, it is forbidden to enter the cage.

F. All parts of the cage should be kept stable without exposing the safety bar.

G. When using the derrick for installation, it shall not be allowed to overload. The derrick can only be used to install or remove the lift parts, and shall not be used for other lifting purposes;

H. When there are hanging objects on the derrick, the hanging cage shall not be started;


Contact Us
Qingdao Aofu Industrial Manufacture Co.,Ltd

Address: No.69-1, Songshan 1 Road, Jimo, Qingdao City, China

Tel: +86-053289065088

Fax: +86-0532-89061036

E-mail: info@qdaofu.net

Copyright © Qingdao Aofu Industrial Manufacture Co.,Ltd
foottop