• img1
  • img2
  • img3

+86-053289065088

info@qdaofu.net

Product Categories

Contact Us

Qingdao Aofu Industrial Manufacture Co.,Ltd
Address:No.69-1, Songshan 1 Road, Jimo, Qingdao City, China
T:+86-053289065088
F:+86-0532-89061036
P:+86 15253297288
Email:info@qdaofu.net
Whatsapp:+86 15154280420
Skype:aofu03

Home > News > Content
Car Repair Lifts Maintenance Of The Equipment

Car Repair Lifts Maintenance of the equipment

Maintenance and maintenance of hydraulic lifts

Not long ago to share the maintenance and maintenance of high-altitude platform, today to share with you the maintenance and maintenance of hydraulic lifts.

1, daily maintenance (each class). In the case of

2. After 1500 hours of work, lift the mechanical and electrical systems. In the case of

3. 5000 hours after the work of the lift, the mechanical, electrical systems in the repair. In the case of

4. After the work of the elevator for 10,000 hours, the mechanical and electrical systems are overhauled. In the case of

Hydraulic lifts maintenance and maintenance of mechanical equipment:

1. The brake of each body should always check and adjust the gap between brake shoe and brake wheel to ensure flexibility and reliability. In the friction surface, there should be no dirt, in case of dirt must be washed with gasoline or thinner. In the case of

2. Reducer, gearbox, external gears and other parts of the lubrication and hydraulic oil are in accordance with the requirements of the lubrication table. In the case of

3. Please pay attention to check the Department of wire rope with broken wire and loose phenomenon. Such as more than the relevant provisions must be immediately renewed. Wire rope maintenance should be strictly in accordance with gb5144-85 requirements. In the case of

4. Always check the connection of the ministries, if loosened should be tightened. Body connection bolts should be checked when the body pressure tightness (can be used to rotate the arm to make the pressure state), all connected to the shaft must have a cotter pin, and need to open fully. In the case of

5. Always check the operation of the institutions are normal, with or without noise, such as failure, must be promptly ruled out. In the case of

6. When installing, removing and adjusting the rotary mechanism, pay attention to ensure that the center of the reducer is parallel to the center line of the gear. The meshing surface is not less than 70% and the meshing gap is suitable. In the case of

7. Always check all wires and cables for damage. To be timely bandaged and replaced with the damaged part. In the case of

8. Encounter the motor has overheated to stop in time, troubleshooting and then continue to run, the motor bearing lubrication to be good. In the case of

9. Each part of the brush, the contact surface to keep clean, adjust the brush pressure, so that the contact area of not less than 50%. In the case of

10. Hydraulic lifts of the control box, distribution box, etc. often keep clean, timely cleaning of electrical equipment on the dust.


Contact Us
Qingdao Aofu Industrial Manufacture Co.,Ltd

Address: No.69-1, Songshan 1 Road, Jimo, Qingdao City, China

Tel: +86-053289065088

Fax: +86-0532-89061036

E-mail: info@qdaofu.net

Copyright © Qingdao Aofu Industrial Manufacture Co.,Ltd
foottop